[OpenSPIM] Great OpenSPIM setup!
edgar.escobar.nieto at ipt.fraunhofer.de
edgar.escobar.nieto at ipt.fraunhofer.de
Wed Jan 29 06:09:34 CST 2014
Hi Neil,
About the changes made to our OpenSPIM setup at Fraunhofer IPT, there are
two main changes:
*The redesign of the sample arm of the 4D Stage so that a timing belt and
timing pulleys can be used instead
of the round belt and pulleys included with the 4D Stage. This was done
because a slip between the belt
and pulleys was identified causing inaccuracies when rotating the sample.
I don't know if someone else had this issue,
*The redesign of the sample chamber so that the temperature of the medium
can be controlled. For doing that a
PT100 special for liquids, TO220 resistors and a PID controller were
employed. The sample chamber had to
be built out of stainless steel so that corrosive effects due to the
sample medium can be avoided.
I can provide you the drawings and the CAD files, also the part number and
manufacturer of the components that
were used, just let me organize the information accordingly.
I think that would make sense to make this information available through
the OpenSPIM wiki so that eveyone can use it if interested.
At the same time I could have a feedback about the changes I made and
further improvements can be done to the design. What is
the opinion of all?
Best regards,
Edgar
__________________________________________
Fraunhofer-Institut für Produktionstechnologie IPT
Edgar Escobar Nieto
Steinbachstraße 17
52074 Aachen
edgar.escobar.nieto at ipt.fraunhofer.de
http://www.ipt.fraunhofer.de
__________________________________________
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://openspim.org/pipermail/openspim/attachments/20140129/2c2a7952/attachment-0002.html>
More information about the OpenSPIM
mailing list